Chippewa County Jail

Gundlach Champion, Inc. was the Design-Build Contractor on this sixty-four bed expansion and renovation.  The two-story addition with a mezzanine was approximately 16,300 square feet of the building area. The low security housing area has four open bays, which house 16 inmates per bay. The entire housing area is monitored from one control room. The facility also includes new kitchen and laundry facilities, a multi-purpose room and detox/holding cells.

Chippewa County Jail Phase II Addition and Renovations

The overall project consisted of the construction of fifty-eight (58) bed addition to the existing Chippewa County Jail facility. The project included all site work and underground utilities as well as protection of existing. Existing soils were poor and were removed and replaced prior to new concrete foundations. The building frames are a combination of structural steel and lead bearing masonry. The ground level has parking similar to the 1999 addition. Due to the nature of he facility the CMU will be reinforced and fully grouted. The exterior is a sealed split face veneer. Interior partitions are painted CMU with glazed block in the wet areas. The building has a membrane roof and skylights for natural light. Finishes consist of VCT flooring and base painted walls. A full compliment of mechanical, plumbing, fire protection, electrical and security systems were installed as well. Gundlach Champion served as the Design Builder for this project. The project was completed in Spring 2009.

  • 180 Traders Mine Road
  • PO Box 490
  • Iron Mountain Mi 49801
  • Toll Free 1.800.743.0603
  • Phone 906.779.2303
  • Fax 906.779.8947
  • Terms of Use